Project Information
Date : 2014 |
Location : İzmit / Turkiye |
Category : COMPLETED PROJECTS |
Complete Construction of DP WORLD Yarımca Container Port, Pillar Quay Construction
The project consists of a main and side quay combining approximately 900m in length in total. The quay structure type is as a deck on steel piles. A dolphin structure is located southeast of the main quay. Also, a large area in the backyard was reserved as a container stock area. The Project includes Dredging, pile driving, quay structure, Reclamation, filling, Soil Improvement (Jet grouting), Building (Steel and Reinforced Concrete Structures), Infrastructures (Storm Water, Waste Water, Fire Water, Potable Water), and Viaduct Construction (Bridge Ramp and Asphalt.)
Tags:
Demo Etiket,