Final Handover Letter For "Infrastructure at Sirt City" Project has received
25 - March - 2010Provisional acceptance letter was taken on 25.03.2010 for "Infrastructure at Sirt City" Project which was undertaken as our company. The project consists of sewage network of 22.340m, potable water network of 23.230m, storm water of 21.760m, firefighting system of 17.440m, asphalt wor ...
Read MoreNAYAP has been awarded Phase 2 works for Benghazi 28th March Stadium Project in Libya
18 - January - 2011The contract was signed on the date 18.01.2011 Phase 2 consist of steel roof structure and membrane , covered areas underneath tribunes, field of play and running tracks, electrical, mechanical and utility services. ...
Read MoreFinal Handover Letter For "5 Stars Seaside Hotel and Infrastructure Works in Sirt City" Project has received
09 - January - 2011Final handover letter was taken on 09.01.2011 for "Seaside Hotel and Infrastructure Works in Sirt City Project" which was undertaken as our company. This project which is located at east of the 100 housing Units consists of design, construction, architectural and interior decoration wo ...
Read MoreFinal Handover Letter For "Renewal Works of Suliman Darrat Basketball Hall in Benghazi City" Project has received.
03 - February - 2011Final Handover letter was taken on 03.02.2011 for "Renewal Works of Basketball Hall in Benghazi City" Project which was undertaken as our company. The project consists of changing of ground, renewing seats of the spectators, maintenance of the dome ceiling, renewal of the facade ...
Read MoreProvisional Acceptance Letter For Civil Works of 28th March Stadium in Benghazi City Project has received
07 - February - 2011Provisional acceptance letter was taken on 07.02.2011 for Civil Works of 28th March Stadium in Benghazi City Project which was undertaken as our company. The Project includes new frames and slabs, precast elements production and placement for grandstands and repairing some sections of the stadium. Cap ...
Read More